Mold Components
Speed to Market— Collapsing Cores Compress Design and Machining Time
What F&M Tool received back from Roehr Tool was much more than the mold manufacturer expected. “Roehr’s engineers designed the complete DT Core assembly and provided conceptual drawings of the mold base from the parting line back.”
Read MoreThink Metric: It’s All in the Numbers, Part 2
Feedback from the field on making the metric conversion in your shop after realizing it just makes sense.
Read MoreA Collaboration to Put “Collapse” on the Rise
“The idea behind Demo Day was let’s not just talk about the benefits of c-core technology, let’s build a mold so people can see up close the true capabilities of the DT Core as it molds a typical cap.”
Read MoreStrategic Partnerships Speed Time-to-Market Process
Westminster Tool Inc. (Plainfield, CT) has found forming strategic partnerships with key suppliers crucial to bringing its customers’ products to market faster.
Read MorePurchasing Considerations for Standard Slide Assemblies
Mold manufacturers must consider several factors when evaluating standard components—quality, cost, design benefits and features, and their effects on the finished tool.
Read MoreCase Study: Mold Components
New Manifold System Offers Quicker Delivery Times without Sacrificing Quality
Read MorePre-Engineered, Modular Tooling Helps Mold Shop Cost Effectively develop Caps and Closures
B&D Machine, Inc. (Tolland, CT) shares how Roehr Tool's ProtoBridge Tool provided a faster and more economical solution for prototyping a new product.
Read MoreAdvanced Prototyping for Threaded Parts
A look at a modular tooling standard designed to help cost effectively develop caps and closures to be either stripped out of the mold or use a collapsible core.
Read MoreStandardizing Short- and Long-Run Production
New hot sprue bushing technology makes it possible to replicate the full hot runner system for low-volume production.
Read More